Flood Risk Assessment (FRA)

Site-specific flood risk assessments, with proportionate mitigation and no unnecessary cost.

Nationwide Fixed fees Fast turnaround

At a glance

  • Accepted by planning authorities UK-wide
  • Fixed fee, quoted up front
  • Fast, reliable turnaround
  • One accountable point of contact

What it is

A Flood Risk Assessment evaluates the risk of flooding to and from your development from all relevant sources — including rivers, the sea, surface water, groundwater and sewers — and demonstrates how the scheme stays safe for its lifetime, accounting for climate change.

When you need it

You may need a Flood Risk Assessment if your site is in Flood Zone 2 or 3, is 1 hectare or larger in Flood Zone 1, or is affected by other sources of flood risk such as surface water, critical drainage issues or future climate change. Your local planning authority may also require one depending on the site and proposed development.

What you get

What's included

Flood zone and risk review using Environment Agency and other relevant flood-risk data

Climate change assessment of future flood risk over the development's lifetime

Sequential and Exception Test support where required

Flood mitigation and drainage recommendations — including SuDS where relevant

Safe access/egress and finished floor level recommendations

Hydraulic modelling where required — flood depths, flows, hazard and the effect of mitigation

The Andrew Simon difference

We size flood resilience and mitigation to what the evidence and planning requirements actually require — avoiding unnecessary measures and keeping costs proportionate to the site.

Not sure whether you need a Flood Risk Assessment?

Send us your site postcode and a brief description of your proposed development, and we'll tell you whether a Flood Risk Assessment is likely to be required and what level of assessment your site may need — usually within a day, at no cost.

Get a quote

How it works

From quote to consent

01

Share your site

Send the postcode, plans and any council correspondence — we confirm scope and fee up front.

02

We assess & value-engineer

Our specialists prepare your Flood Risk Assessment, finding the most cost-effective route that still satisfies the regulator.

03

Consent-ready report

A clear report the authority will accept, with us on hand for any queries or conditions.

Standards we work to

Key considerations

The regulations, tests and terminology behind every Flood Risk Assessment we produce.

NPPFFlood Zone 2/3Sequential TestException TestLead Local Flood Authorityclimate change allowancesfunctional floodplain

FAQs

Frequently asked

Do I need a Flood Risk Assessment?

Usually yes if you're in Flood Zone 2 or 3, or your site is 1 hectare or larger in any flood zone, or if the council or Environment Agency has asked for one. Send your postcode and we'll confirm.

How much does an FRA cost?

It depends on the flood zone and scheme complexity, but we quote a fixed fee up front so there are no surprises.

How long does it take?

Most site-specific FRAs are delivered within one to two weeks of instruction.

Tell us about your site

Send us your location and plans for a fast, fixed-fee quote — and honest advice on exactly which reports you do and don't need.