Phase 1 Preliminary Risk Assessment

LCRM-compliant assessments that identify contamination risks early and avoid unnecessary investigation.

Nationwide Fixed fees Fast turnaround

At a glance

  • Accepted by planning authorities UK-wide
  • Fixed fee, quoted up front
  • Fast, reliable turnaround
  • One accountable point of contact

What it is

A Phase 1 Preliminary Risk Assessment (desk study) reviews a site's history, geology and setting to build a conceptual site model and identify potential contaminant linkages (source–pathway–receptor).

When you need it

Commonly conditioned on brownfield or previously developed sites, or where a sensitive end use such as housing is proposed.

What you get

What's included

Historical map and land-use review

Environmental and geological data search

Site walkover and conceptual site model

Qualitative risk assessment and clear recommendations

The Andrew Simon difference

A thorough Phase 1 is the cheapest insurance there is — done well, it frequently avoids the cost and delay of intrusive Phase 2 investigation.

Not sure whether you need a Phase 1 Preliminary Risk Assessment?

Send us your site postcode and a brief description of your proposed development, and we'll tell you whether a Phase 1 Preliminary Risk Assessment is likely to be required and what level of assessment your site may need — usually within a day, at no cost.

Get a quote

How it works

From quote to consent

01

Share your site

Send the postcode, plans and any council correspondence — we confirm scope and fee up front.

02

We assess & value-engineer

Our specialists prepare your Phase 1 Preliminary Risk Assessment, finding the most cost-effective route that still satisfies the regulator.

03

Consent-ready report

A clear report the authority will accept, with us on hand for any queries or conditions.

Standards we work to

Key considerations

The regulations, tests and terminology behind every Phase 1 Preliminary Risk Assessment we produce.

LCRMconceptual site modelsource–pathway–receptorcontaminant linkagedesk studysite walkoverdischarge of condition

FAQs

Frequently asked

Is a desk study the same as a preliminary risk assessment?

Yes — the Phase 1 Preliminary Risk Assessment and the desk study are the same report.

Will I still need a Phase 2?

Not always. A robust Phase 1 can discharge the condition on its own where risks are low; we tell you honestly either way.

How long does it take?

Typically one to two weeks from instruction.

Tell us about your site

Send us your location and plans for a fast, fixed-fee quote — and honest advice on exactly which reports you do and don't need.